π Get a Commercial EV Charging Assessment
Confirm electrical capacity, charger type (Level 2 vs DC Fast), permitting requirements, and BC Hydro / CleanBC rebate eligibility.
Electric vehicle adoption across British Columbia continues to accelerate, requiring businesses, property managers, and facility managers to install reliable charging infrastructure. Whether you manage workplace properties, multi-unit residential buildings, or commercial fleets in Vancouver and the Lower Mainland, professional EV charging station installation ensures electrical compliance, rebate eligibility, and long-term operational reliability.
Metcalfe Lighting β Commercial & Industrial Electrical Contractor
Commercial & industrial electrical contractor (Vancouver / Lower Mainland)
BC family owned & operated since 1985
Permits and inspections coordinated
BC Hydro / CleanBC rebate guidance (pre-approval support)
Licensed & insured commercial electricians Β· Code-compliant installations
Level 2 vs DC Fast Charging: Choosing the Right Solution
Selecting the appropriate charging technology depends on parking duration and operational requirements. Installing the wrong system can significantly increase costs without delivering meaningful benefits.
Level 2 (208β240V)
β’ 4β8 hours for a full charge
β’ Best for long-dwell parking (workplaces, condos, hotels, retail)
DC Fast Charging (DCFC)
β’ 80% charge in 20β40 minutes
β’ Best for rapid turnover (public hubs, fleet operations)
Rule of thumb:
If vehicles park longer than ~2 hours, Level 2 charging provides the best economics and simplest electrical scope. DC fast charging is best reserved for high-turnover applications where speed justifies major infrastructure investment.
Level 2 EV Charger Installation (Most Commercial Projects)
Level 2 charging stations operate at 208β240V and fully charge most EVs within 4β8 hours. This is the most common solution for commercial and multi-unit residential properties.
Common applications:
Workplace and office parking
Apartment and condominium buildings (MURBs)
Hotels and hospitality properties
Retail employee parking
Property management portfolios
Electrical infrastructure:
40β80 amp dedicated circuits per charger
Compatible with many existing electrical services
Load management options to reduce upgrade costs
Lower installation cost than DC fast charging
Eligible for BC Hydro / CleanBC rebates
DC Fast Charging (High-Power, Specialized Installations)
DC fast charging delivers rapid charging speeds but requires significant electrical infrastructure and planning.
Typical applications:
Public charging hubs
Fleet depots requiring fast turnaround
Highway corridors
Destination charging in dense urban areas
Infrastructure requirements:
480V three-phase electrical service
50β350+ kW capacity per charger
Utility coordination often required
Specialized engineering and design
Higher capital investment
Most commercial properties installing EV charging for employees, residents, or customers find Level 2 chargers deliver sufficient charging speed at substantially lower cost.
Who We Serve β Commercial EV Charging Vancouver
Metcalfe Lighting installs EV charging infrastructure for:
Workplace Properties β Office buildings, industrial facilities, and commercial campuses
Multi-Unit Residential Buildings (MURBs) β Strata councils, apartments, condos, parkades, underground parking
Commercial Real Estate β Retail centers, mixed-use developments, tenant amenities
Fleet Operations β Corporate, delivery, and municipal vehicle depots
Hospitality & Retail β Hotels, restaurants, and destination venues
Property Management Companies β Multi-site portfolios and standardized rollouts

BC Hydro / CleanBC EV Charger Rebates
British Columbiaβs CleanBC Go Electric programs significantly reduce the cost of commercial EV charger installation.
Important:
π Pre-approval is required before equipment is purchased or work begins.
We assist with rebate planning, documentation, and compliance throughout the process.
Workplace Charging Rebates
Up to 50% of eligible costs
$2,000 per charger
$14,000 per location
$56,000 annual maximum across multiple sites
Multi-Unit Residential Building (MURB) Rebates
EV Ready Planning
75% covered, up to $3,000
Infrastructure & Charger Installation
Up to 50% covered
$2,000 per charger
$14,000 per building
Fleet Charging Programs
Available for businesses transitioning vehicle fleets to electric, covering infrastructure design and installation.
Compliance requirements include:
Pre-approval before purchase
Networked Level 2 chargers from approved lists
Licensed electrician installation
Permits and inspections
OCPP-compatible equipment
Proper documentation submission
Electrical Planning for Commercial EV Charging
Electrical Capacity Assessment
We evaluate service ratings, panels, load calculations, and available capacity to determine upgrade requirements or load-sharing opportunities.
Load Management Systems
Load management allows multiple chargers to share existing electrical capacity, avoiding costly service upgrades and supporting future expansion.
Electrical Service Upgrades
When required, we coordinate BC Hydro service upgrades and manage utility timelines (typically 8β16 weeks).
Permitting & Inspections
All installations are permitted and inspected through Technical Safety BC or local authorities, ensuring compliance with the BC Electrical Code and CSA-certified equipment standards.
Our Commercial EV Charging Installation Process
Electrical Assessment β Capacity review, charger placement, load calculations
Recommendations & Proposal β Scope, costs, rebates, and net investment
Rebate Pre-Approval β Documentation submitted before work begins
Equipment Procurement β Approved, networked commercial hardware
Professional Installation β Permitted, inspected, code-compliant work
Rebate Finalization β Submission of completion documentation
Frequently Asked Questions
(FAQs unchanged β content is already strong and compliant)
Get a Commercial EV Charging Assessment
π Check Eligibility & Request Assessment
Confirm electrical capacity, charger type, permitting requirements, and rebate readiness.
Takes about 60 seconds. No obligation.
Service Area: Vancouver, Burnaby, Richmond, Surrey, and the Lower Mainland
Related Services
Commercial Lighting Services
Lighting Audits & Energy Analysis
Contact / Service Request Form