πŸ‘‰ Get a Commercial EV Charging Assessment


Confirm electrical capacity, charger type (Level 2 vs DC Fast), permitting requirements, and BC Hydro / CleanBC rebate eligibility.

Electric vehicle adoption across British Columbia continues to accelerate, requiring businesses, property managers, and facility managers to install reliable charging infrastructure. Whether you manage workplace properties, multi-unit residential buildings, or commercial fleets in Vancouver and the Lower Mainland, professional EV charging station installation ensures electrical compliance, rebate eligibility, and long-term operational reliability.

Metcalfe Lighting – Commercial & Industrial Electrical Contractor

Commercial & industrial electrical contractor (Vancouver / Lower Mainland)

BC family owned & operated since 1985

Permits and inspections coordinated

BC Hydro / CleanBC rebate guidance (pre-approval support)

Licensed & insured commercial electricians Β· Code-compliant installations

Level 2 vs DC Fast Charging: Choosing the Right Solution

Selecting the appropriate charging technology depends on parking duration and operational requirements. Installing the wrong system can significantly increase costs without delivering meaningful benefits.

Level 2 (208–240V)
β€’ 4–8 hours for a full charge
β€’ Best for long-dwell parking (workplaces, condos, hotels, retail)

DC Fast Charging (DCFC)
β€’ 80% charge in 20–40 minutes
β€’ Best for rapid turnover (public hubs, fleet operations)

Rule of thumb:
If vehicles park longer than ~2 hours, Level 2 charging provides the best economics and simplest electrical scope. DC fast charging is best reserved for high-turnover applications where speed justifies major infrastructure investment.

Level 2 EV Charger Installation (Most Commercial Projects)

Level 2 charging stations operate at 208–240V and fully charge most EVs within 4–8 hours. This is the most common solution for commercial and multi-unit residential properties.

Common applications:

Workplace and office parking

Apartment and condominium buildings (MURBs)

Hotels and hospitality properties

Retail employee parking

Property management portfolios

Electrical infrastructure:

40–80 amp dedicated circuits per charger

Compatible with many existing electrical services

Load management options to reduce upgrade costs

Lower installation cost than DC fast charging

Eligible for BC Hydro / CleanBC rebates

DC Fast Charging (High-Power, Specialized Installations)

DC fast charging delivers rapid charging speeds but requires significant electrical infrastructure and planning.

Typical applications:

Public charging hubs

Fleet depots requiring fast turnaround

Highway corridors

Destination charging in dense urban areas

Infrastructure requirements:

480V three-phase electrical service

50–350+ kW capacity per charger

Utility coordination often required

Specialized engineering and design

Higher capital investment

Most commercial properties installing EV charging for employees, residents, or customers find Level 2 chargers deliver sufficient charging speed at substantially lower cost.

Who We Serve – Commercial EV Charging Vancouver

Metcalfe Lighting installs EV charging infrastructure for:

Workplace Properties – Office buildings, industrial facilities, and commercial campuses
Multi-Unit Residential Buildings (MURBs) – Strata councils, apartments, condos, parkades, underground parking
Commercial Real Estate – Retail centers, mixed-use developments, tenant amenities
Fleet Operations – Corporate, delivery, and municipal vehicle depots
Hospitality & Retail – Hotels, restaurants, and destination venues
Property Management Companies – Multi-site portfolios and standardized rollouts


BC Hydro / CleanBC EV Charger Rebates

British Columbia’s CleanBC Go Electric programs significantly reduce the cost of commercial EV charger installation.

Important:
πŸ‘‰ Pre-approval is required before equipment is purchased or work begins.

We assist with rebate planning, documentation, and compliance throughout the process.

Workplace Charging Rebates

Up to 50% of eligible costs

$2,000 per charger

$14,000 per location

$56,000 annual maximum across multiple sites

Multi-Unit Residential Building (MURB) Rebates

EV Ready Planning

75% covered, up to $3,000

Infrastructure & Charger Installation

Up to 50% covered

$2,000 per charger

$14,000 per building

Fleet Charging Programs

Available for businesses transitioning vehicle fleets to electric, covering infrastructure design and installation.

Compliance requirements include:

Pre-approval before purchase

Networked Level 2 chargers from approved lists

Licensed electrician installation

Permits and inspections

OCPP-compatible equipment

Proper documentation submission

Electrical Planning for Commercial EV Charging
Electrical Capacity Assessment

We evaluate service ratings, panels, load calculations, and available capacity to determine upgrade requirements or load-sharing opportunities.

Load Management Systems

Load management allows multiple chargers to share existing electrical capacity, avoiding costly service upgrades and supporting future expansion.

Electrical Service Upgrades

When required, we coordinate BC Hydro service upgrades and manage utility timelines (typically 8–16 weeks).

Permitting & Inspections

All installations are permitted and inspected through Technical Safety BC or local authorities, ensuring compliance with the BC Electrical Code and CSA-certified equipment standards.

Our Commercial EV Charging Installation Process

Electrical Assessment – Capacity review, charger placement, load calculations

Recommendations & Proposal – Scope, costs, rebates, and net investment

Rebate Pre-Approval – Documentation submitted before work begins

Equipment Procurement – Approved, networked commercial hardware

Professional Installation – Permitted, inspected, code-compliant work

Rebate Finalization – Submission of completion documentation

Frequently Asked Questions

(FAQs unchanged – content is already strong and compliant)

Get a Commercial EV Charging Assessment

πŸ‘‰ Check Eligibility & Request Assessment
Confirm electrical capacity, charger type, permitting requirements, and rebate readiness.
Takes about 60 seconds. No obligation.

Service Area: Vancouver, Burnaby, Richmond, Surrey, and the Lower Mainland

Related Services

Commercial Lighting Services

Lighting Audits & Energy Analysis

Contact / Service Request Form